About Us | Contact Us | Sign In
Discovery Automotive Visitor Badge
BackTestarossa: Phase Nine

Phase Nine

We continue to tend to the final hardware integration as well as detailing items as associated with this project.

With the custom fire suppression system as designed by Shadowman back on line we then verified that there were no leaks.

[ View Pictures ]
Here we continue the process of detailing everything as we progress through the project. Soap and water when we are able and a bit-o-paint when needed.

[ View Pictures ]
Here we are installing foil tape collars at the dry sump oil tank lines because the OEM Mylar sleeve tends to come lose and look disheveled at the ends.

[ View Pictures ]
Here a fresh load of OEM motor oil is being installed.

[ View Pictures ]
Here we have repaired a directional indicator light stud on the back side of the custom carbon fiber instrument cluster panel. It was found to be lose when the panel was removed to tend to another gauge issue.

[ View Pictures ]
Here a new OEM battery is being installed.

[ View Pictures ]
Here she is receiving a final inspection as she is now ready to be brought back to life.

[ View Pictures ]
Now we will complete the tuning process after which she will be methodically wrapped aka the comprehensive clear bra coverage will be installed as she is soon to be reunited with her owner and exercised once again.

[ Previous Section | Next Section ]

Copyright (c) 2011 Discovery Automotive. Web site design copyright (c) 2011 ForceOne Technologies. Logos are copyright and/or trademarked by their respective holders. All rights reserved.
Home | Projects | Media | Articles | Contact Us | About Us